Jim Robbins and Associates, Inc.

Products and Systems

Manufacturers

Testing Facilities

About Us

News and Events

Links

 

Contact Us

 

Hi-Vac Application Data Form

Name*: 
Title:
Company*:
Address*:
City*:
State*:
Zip*: 
Phone*: 
Fax*: 
E-Mail*:
Website:
Primary Product:

 

 
*General description of your application:
*Material(s) to be vacuumed:
Characteristics of the material:
(e.g. wet, dry, sticky, hydroscopic, fibrous, granular, abrasive, free-flowing, bridges easily, electrostatic, explosive, acid, etc.)
*Required vacuuming rate:
(metric tons , U.S. tons ,liters, gallons, cubic feet, or other measure per hour)
Expected vacuum use:
(hours per day, or describe different usage rate)
*Horizontal vacuuming distance: (meters / feet)
*Vertical vacuuming distance: (meters / feet)
*Maximum material size:
Typical material particle size:
Material weight: (kg per liter / lbs per cu. ft.)
Material moisture content: (as a %)
Material temperature: (°C / °F)
Type of system required:
A. Roll end-dump hopper system.
Roll end-dump hopper yardage capacities: 1/4, 3/4, 1, 1-1/2, 2
B. Bottom-dump hopper system. Material container volume required:
Preferred method of product discharge: Batch dump, Continuous
C. Other system; please describe:
Describe how you want the vacuumed material to be disposed/processed after capture.
Available powersupply for vacuum pump: Volts, Phase, Hertz.
If engine drive is preferred,
please refer to "Optional Specialty Requirements" question number 3.
*Is compressed air available? Yes, No
...If yes, what pressure is available?
(mbars/psi)
Location location: Indoor, Outdoor
Altitude of vacuum pump: (meters / feet above sea level)
Please describe any additional details which we should be aware of:

 

Additional Questions for Fixed Manifold System (if required):
1. Approximate area to be cleaned:
2. Frequency of cleaning:
3. Vertical vacuuming distance: (meters / feet)
4. Distance to furthest outlet from vacuum system: (meters / feet)
5. Total number of pickup points:
6. Number of persons vacuuming simultaneously:
7. In order to best serve you, please e-mail/fax a plant layout sketch.

 

Optional Specialty Requirements (if required):
1. Explosion/hazard proof
A. Required NEMA enclosure type?
B. Does motor need to be explosion proof? Yes, No
C. Describe any special construction and/or hazard requirements:
2. Towable In plant, Towable Over-the-road
Special ground clearance requirements:
(centimeters / inches)
3. Diesel Engine drive
LPG Engine drive
Gasoline Engine drive
4. HEPA filtration
5. Noise specification
Maximum decibels @ 1 meter from vacuum:
6. Intercept hopper. Please describe:
7. Welding specification. Please describe:
8. For export. Please describe special requirements:
9. Paint specification. Please describe:
10. Please describe any additional requirements that must be addressed:

 

Comments:

*Please indicate purchase time frame for your application:
Immediate Within 6 months Within 1­2 months Not known


Please confirm your request by typing "JRA" in this box: